MYWATER was appointed to design, supply, and commission a replacement booster set for Applebee Care Home in Liverpool. The existing system had become increasingly inefficient and unreliable, leading to inconsistent water pressure and maintenance issues that affected day-to-day operations within the facility.
The brief was to provide a modern, energy-efficient twin pump booster solution capable of delivering consistent water pressure throughout the building, ensuring reliable operation across all resident rooms, kitchens, and service areas while maintaining a quiet and efficient system suitable for a care environment.
Key Project Facts
- Location: Applebee Care Home, 173 Roughwood Dr, Liverpool L33 8YR
- Building Type: Care Home
- Product Installed: MYBOOST-2V-CRIE15-3-400-8
- Application: Water pressure boosting
- Commissioned by: MYWATER